2007 to 2011

In 2011 we completed 80% of the restoration, our aim to upgrade the house while also retaining many of its original features

Each room, floor and ceiling had to be reviewed. In 2009 the roof was replaced with original banger slates, new skylights and to the rear we removed two “odd shaped” top floor windows replacing them with traditional square ones all of the same size. Under parquet tiles throughout the ground floor we found original timber floors and with some sanding and restoration these have been returned to their original glory.